This is a state-of-the-art geochemical technique that enables prediction of the amount of metal in a prospect
Case study
Before the pre-feasibility study the resource estimation for the whole mineralized zone was calculated on the basis of surface geochemistry (Figures 1 and 2) to be 108 and 91 tonnes of gold based on different sampling intervals.
After trenching and drilling gold reserves for the sub-areas 1+2+3 outlined in red (Figure 2) were estimated for the pre-feasibility study to be 32 t Au